2712-WBS, Diamond Mist Drill Water Bottle Swivel Set

$180.84

Description: Diamond Mist Drill Water Bottle Swivel Set

Brand: Bordo

MPN: 2712-WBS

Quantity Per Package: 1 piece

Out of stock

SKU: 2712-WBS Category: Tags: , Brand:

Description

About this item:
  • Diamond Mist Drill Water Bottle Swivel Set
  • The Bordo Diamond Mist Drill System consists of a water feed drill body which is used in conjunction with a water bottle swivel set or a pressure water bottle.
  • Replaceable diamond cutters affix to a non-wearing shank which joins the cutters to the water feed body.
  • The Bordo range of diamond drills are ideally suited to cutting ceramics, porcelain tiles and stone.
  • They produce no-crack, burr-free holes with minimum spalling.
  • The interchangeable cutters result in a lower cost per hole than some other diamond drill solutions.
  • Rotary only action ensures low noise and vibration.
  • Diamond mist drills are designed to deliver the correct amount of lubrication to maximise drill life and optimise drilling performance.
  • Cutter size 5.0 to 10.0mm Rotation Speed 15000 to 3000 RPM.
  • Cutter size 11.0 to 24.0mm Rotation Speed 7000 to 1500 RPM.